BREAKING
LIVE MARKETS
US📈 S&P 500$5,738.17▲ 0.41% METAL🥇 GOLD$2,658.40/oz▲ 0.52% ENERGY🛢️ BRENT$71.89/bbl▲ 0.68% CRYPTO₿ BTC$65,840.00▲ 1.85% IN🇮🇳 NIFTY 50₹26,178.95▲ 0.30% METAL🥈 SILVER$31.62/oz▲ 1.18% US💻 NASDAQ$18,179.59▲ 0.60% ENERGY🛢️ WTI CRUDE$68.18/bbl▲ 0.75% CRYPTOΞ ETH$2,664.20▲ 2.10% IN🇮🇳 SENSEX₹85,571.85▲ 0.28% US🏛️ DOW$42,313.00▲ 0.33% CRYPTO◎ SOL$156.40▲ 4.30% UK🇬🇧 FTSE 100£8,320.72▲ 0.43% CRYPTO⬡ BNB$598.20▲ 0.85% US📈 S&P 500$5,738.17▲ 0.41% METAL🥇 GOLD$2,658.40/oz▲ 0.52% ENERGY🛢️ BRENT$71.89/bbl▲ 0.68% CRYPTO₿ BTC$65,840.00▲ 1.85% IN🇮🇳 NIFTY 50₹26,178.95▲ 0.30% METAL🥈 SILVER$31.62/oz▲ 1.18% US💻 NASDAQ$18,179.59▲ 0.60% ENERGY🛢️ WTI CRUDE$68.18/bbl▲ 0.75% CRYPTOΞ ETH$2,664.20▲ 2.10% IN🇮🇳 SENSEX₹85,571.85▲ 0.28% US🏛️ DOW$42,313.00▲ 0.33% CRYPTO◎ SOL$156.40▲ 4.30% UK🇬🇧 FTSE 100£8,320.72▲ 0.43% CRYPTO⬡ BNB$598.20▲ 0.85%
Markets

Chennai's Virugambakkam Canal Storm-Water Drain to Be Ready in 2 Weeks, Says GCC Commissioner

GCC Commissioner G.S. Sameeran inspected ongoing storm-water drain construction near Virugambakkam canal in Chennai, including retaining walls and silt removal, at an estimated cost of ₹30 crore. The project is slated for completion within two weeks, aiming to improve drainage and reduce flooding in the area.

Greater Chennai Corporation (GCC) Commissioner G.S. Sameeran on Tuesday inspected the ongoing construction of a storm-water drain near the Virugambakkam canal in Chennai. The project, estimated at ₹30 crore, includes the construction of retaining walls and the removal of silt and waste. Officials said the work is expected to be completed within two weeks.

The inspection comes as part of the GCC's efforts to enhance the city's drainage infrastructure ahead of the monsoon season. The Virugambakkam canal has historically been prone to flooding, causing inconvenience to residents. The ₹30 crore project aims to mitigate these issues by improving water flow and preventing blockages. Commissioner Sameeran reviewed the progress and instructed officials to expedite the work without compromising quality.

The completion of this project is expected to provide relief to residents in and around Virugambakkam, who have long demanded better drainage facilities. It also aligns with the GCC's broader plan to upgrade storm-water drains across Chennai. With the monsoon approaching, the timely completion of this drain is crucial to prevent waterlogging and ensure public safety. The GCC has urged residents to cooperate during the final phase of construction.

Original Source: The Hindu National

Comments (0)

No comments yet. Be the first to share your thoughts!

Leave a Comment

301db2964125f49629eaa91c37ffc0b435719c7a40b08bc2b61d2aced300b770
Your comment will appear after moderation. Max 2000 characters.